Site Final | 7/26/2011 | 7/26/2011 | 7/27/2011 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 7/27/2011 | 7/27/2011 | 7/27/2011 | P | PASS |
Dave Hannah
|
|
|
|
Site Final | 6/1/2011 | 6/1/2011 | 6/1/2011 | A | NR |
Dave Hannah
|
|
|
needs to finish landscapeing
|
Random Inspection | 5/16/2011 | 5/16/2011 | 5/16/2011 | A | PASS |
Troy James
|
|
|
|
BMP Violation | 3/28/2011 | 3/28/2011 | 3/28/2011 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all sediment and debris off of all hard surfaces. Pick up aand secure down down the porter pottie. Will re-inspect on 3/29/2011 am.
|
General Inspection | 2/4/2011 | 2/4/2011 | 2/4/2011 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 1/14/2011 | 1/14/2011 | 1/14/2011 | P | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 1/13/2011 | 1/13/2011 | 1/13/2011 | A | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 1/6/2011 | 1/10/2011 | 1/10/2011 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 1/6/2011 | 1/6/2011 | 1/6/2011 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT permit SFD | | | 1/3/2011 | | |
|
|
|
|
Application received | | | 12/16/2010 | | |
|
|
|
|