Site Final | 6/16/2011 | 6/22/2011 | 6/27/2011 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 6/27/2011 | 6/27/2011 | 6/27/2011 | P | PASS |
Dave Hannah
|
|
|
|
Site Final | 6/13/2011 | 6/20/2011 | 6/20/2011 | A | NR |
Dave Hannah
|
|
|
|
Site Final | 6/17/2011 | 6/17/2011 | 6/17/2011 | P | NR |
Jim Storey
|
|
|
|
Random Inspection | 4/28/2011 | 4/28/2011 | 4/28/2011 | A | PASS |
Troy James
|
|
|
|
Random Inspection | 3/15/2011 | 3/15/2011 | 3/15/2011 | P | PASS |
Jim Storey
|
|
|
|
BMP Violation | 3/10/2011 | 3/11/2011 | 3/11/2011 | A | PART |
Clint A Smith
|
|
|
Site has been free'd of sediment and debris on all hard surfaces. Have begun to install the sediment barriers where needed.
|
BMP Violation | 3/10/2011 | 3/10/2011 | 3/10/2011 | P | FAIL |
Clint A Smith
|
|
|
Correction Notice(given to RP) 1. Clean up all sediment and debrsi off of all hard surfaces. 2. Install sediment on all areas of lot where the grade is over a 2% behind sidewalk and there is not vegitative buffer between the disturbed soil and gutter pan. ** Failure to comply with notice will result in a Stop Work Order. Will re-inspect on 3/11/2011 AM.
|
Random Inspection | 2/9/2011 | 2/9/2011 | 2/10/2011 | P | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 2/8/2011 | 2/8/2011 | 2/9/2011 | P | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 1/6/2011 | 1/10/2011 | 1/10/2011 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 1/6/2011 | 1/6/2011 | 1/6/2011 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT permit SFD | | | 1/3/2011 | | DONE |
|
|
|
|
Application received | | | 12/20/2010 | | |
|
|
|
|