General Inspection | 4/26/2012 | 4/26/2012 | 4/26/2012 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 4/26/2012 | 4/26/2012 | 4/26/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/26/2012 | 3/26/2012 | 3/27/2012 | | PART |
Clint A Smith
|
|
|
waiting on vegitation to establish.
|
General Inspection | 2/23/2012 | 2/23/2012 | 2/23/2012 | | PASS |
Clint A Smith
|
|
|
Waiting on vegitation to establish.
|
General Inspection | 1/23/2012 | 1/23/2012 | 1/23/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 11/17/2011 | 11/17/2011 | 11/18/2011 | | PART |
Clint A Smith
|
|
|
No activity.
|
General Inspection | 10/10/2011 | 10/10/2011 | 10/10/2011 | | PASS |
Daryl DeGrange
|
|
|
site clean, same shape as previous inspection. No new vegetation growth
|
General Inspection | 9/8/2011 | 9/8/2011 | 9/9/2011 | | PART |
Daryl Spivey
|
|
|
Still in same shape as previous inspection notes. Waddles in place but no seeding has taken place at this time. Still bare ground in most of the area.................ds
|
General Inspection | 8/8/2011 | 8/8/2011 | 8/8/2011 | | PART |
Steven Webb
|
|
|
Structures completed, working on site stabilization. Bare ground has been installed with many l. feet of sediment barriers, (straw wattles). Some straw blankets installed, rp could not tell me if seeding had taken place prior to seeding or not. Options discussed and basic information regarding proper re-stabilization took place. I informed RP that Boise City needs re-vegetation (at least 70%) to completed the terms of the ESC permit.
|
General Inspection | 7/7/2011 | 7/7/2011 | 7/7/2011 | | PASS |
Clint A Smith
|
|
|
NO activity waiting on stabilization
|
General Inspection | 6/6/2011 | 6/6/2011 | 6/6/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/6/2011 | 5/6/2011 | 5/6/2011 | | PART |
Steven Webb
|
|
|
Gate to inside the work area was closed but the support staging area was ok, trash managment is a little poor, concrete debris needs to be removaed from site but overall things are not to bad, sign posted.
|
DOC - Permit Finaled | 5/6/2011 | 5/6/2011 | 5/6/2011 | P | PASS |
Steven Webb
|
|
|
|
Change Status (ISS) | | | 5/6/2011 | | DONE |
|
|
|
finaled by mistake
|
General Inspection | 4/5/2011 | 4/5/2011 | 4/5/2011 | | PART |
Steven Webb
|
|
|
Verbal to RP, maintain wash out pit, service broken sediment barriers.
|
General Inspection | 3/3/2011 | 3/3/2011 | 3/3/2011 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 1/28/2011 | 1/31/2011 | 1/31/2011 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/28/2011 | 1/28/2011 | 1/28/2011 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install a sediment barrier alond the driveway where the widening will be occuring. Also Post the ESC sign where visable from the street. Will re-inspect on 1/31/2011AM.
|
Issue & PRINT permit COM | | | 1/26/2011 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/30/2010 | | 12/30/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions.
|
Application received | | | 12/22/2010 | | |
|
|
|
|