Site Final | 5/24/2011 | 5/24/2011 | 5/24/2011 | P | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 5/24/2011 | 5/24/2011 | 5/24/2011 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 4/21/2011 | 4/21/2011 | 4/22/2011 | P | PASS |
Tony Young
|
|
|
|
BMP Violation | 4/5/2011 | 4/7/2011 | 4/7/2011 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/5/2011 | 4/5/2011 | 4/5/2011 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 3/1/2011 | 3/3/2011 | 3/3/2011 | A | PASS |
Clint A Smith
|
|
|
Concrete washout Orion & Pleasant Hill.
|
Complaint Inspection | 3/1/2011 | 3/1/2011 | 3/1/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal RP: CORRECTION NOTICE(VERBAL) Clean up all concrete washout residual on the vacant lot located on the corner of Orion and Pleasant Hill where it was used as a commen washout for all active lots under construction. Failure to comply with the notice will result in further enforcement. Will re-inspect on 3/3/2011AM.
|
General Inspection | 3/1/2011 | 3/1/2011 | 3/1/2011 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 1/28/2011 | 1/28/2011 | 1/28/2011 | P | CANC |
Tom Arcoraci
|
|
|
|
Site Preparation | 1/26/2011 | 1/27/2011 | 1/27/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Provide perimeter controls on the front of the lot.
|
General Inspection | 1/26/2011 | 1/26/2011 | 1/26/2011 | | CANC |
Clint A Smith
|
|
|
Meeting up with RP tomorrow for the Site Prep inspection to go over there plan.
|
Issue & PRINT permit SFD | | | 1/25/2011 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 1/5/2011 | | 1/5/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions.
|
Application received | | | 1/3/2011 | | |
|
|
|
|