General Inspection | 3/18/2011 | 3/18/2011 | 3/18/2011 | | DONE |
Clint A Smith
|
|
|
PErmit finalled.
|
DOC - Permit Finaled | 3/18/2011 | 3/18/2011 | 3/18/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/3/2011 | 3/3/2011 | 3/3/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/16/2011 | 2/16/2011 | 2/16/2011 | | PASS |
Clint A Smith
|
|
|
All work complete. Waiting on the spring to remove the hay bales at the discharge point of the pond.
|
Site Preparation | 1/19/2011 | 2/1/2011 | 2/1/2011 | A | PART |
Clint A Smith
|
|
|
BMP's inplace of the vault. Explained to RP to keep an eye on the clarity of the discharge while clearing out the tully's within the pond. the final discharge of the pond is an outfall off of Walnut street into the Boise River. All debris from the extraction will bee placed at the airport.
|
Site Preparation | 1/18/2011 | 1/28/2011 | 1/28/2011 | A | NR |
Clint A Smith
|
|
|
Will begin on 2/1/2011. Inspection will be completed on that date.
|
Site Preparation | 1/17/2011 | 1/17/2011 | 1/18/2011 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT to be Invoiced | | | 1/14/2011 | | DONE |
|
|
|
|
Application received | | | 1/13/2011 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 1/13/2011 | | DONE |
Christina Prado
|
|
|
|
Routing - Erosion and Sediment | 1/13/2011 | | | | |
Steven Webb
|
|
|
|