Site Final | 8/23/2011 | 8/24/2011 | 8/25/2011 | A | PASS |
Clint A Smith
|
|
|
Phone #: ###-#### >> Inspection requested via web by Gary Simon
|
DOC - Permit Finaled | 8/25/2011 | 8/25/2011 | 8/25/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/1/2011 | 8/1/2011 | 8/1/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 7/7/2011 | 7/7/2011 | 7/7/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 6/22/2011 | 6/22/2011 | 6/22/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 6/10/2011 | 6/10/2011 | 6/10/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 5/25/2011 | 5/25/2011 | 5/25/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 5/20/2011 | 5/20/2011 | 5/20/2011 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 5/4/2011 | 5/4/2011 | 5/5/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 4/22/2011 | 4/22/2011 | 4/22/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 4/18/2011 | 4/18/2011 | 4/18/2011 | P | PASS |
Tom Arcoraci
|
|
|
sign is up
|
Site Preparation | 4/1/2011 | 4/6/2011 | 4/6/2011 | A | PART |
Clint A Smith
|
|
|
Verbal to RP: Post ESC sign where vidable from the street.
|
Site Preparation | 3/30/2011 | 4/1/2011 | 4/1/2011 | A | DONE |
Clint A Smith
|
|
|
Confrence with RP: Went over the scope of work and area of disurbance. Recommend that delinating the disturbed area work be a considible BMP to keep the area of disturbance under an acre due to the proposed are being .88 acres. Also to use approved inlet protection within the storm drain inlet protection instead of filter fabric. Will follow up with a site prep on 4/6/2011AM
|
General Inspection | 3/30/2011 | 3/30/2011 | 3/30/2011 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 3/29/2011 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 1/26/2011 | | 1/26/2011 | | PASS |
Clint A Smith
|
|
|
ESC plan approved per the attached conditions.
|
Application received | | | 1/18/2011 | | |
|
|
|
|