Aging Inspection | 5/21/2012 | 5/21/2012 | 5/21/2012 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 5/21/2012 | 5/21/2012 | 5/21/2012 | P | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 3/19/2012 | 3/19/2012 | 3/21/2012 | | DONE |
Jack Frank
|
|
|
|
Random Inspection | 3/21/2012 | 3/21/2012 | 3/21/2012 | A | PASS |
Jack Frank
|
|
|
site ok not ready ready for final
|
Aging Inspection | 1/16/2012 | 1/16/2012 | 1/17/2012 | | CANC |
Clint A Smith
|
|
|
Holiday.
|
Aging Inspection | 11/16/2011 | 11/16/2011 | 11/16/2011 | | PART |
Clint A Smith
|
|
|
Have initiated stabilizetion on all of the disturbed areas. Waiting on a uniformed coverage of established vegatation.
|
Aging Inspection | 7/14/2011 | 7/14/2011 | 7/14/2011 | | CANC |
Alan Hauser
|
|
|
|
Site Preparation | 3/8/2011 | 3/8/2011 | 3/8/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: must install a stabilized access to the staging area from the eisment road to miniumize any tracking. Will re-inspect on 3/10/2011
|
Site Preparation | 1/27/2011 | 1/27/2011 | 1/27/2011 | | NR |
Clint A Smith
|
|
|
|
Routing - Erosion and Sediment | 1/21/2011 | | 1/24/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/24/2011 | | |
|
|
|
|
Telephone call | | | 1/24/2011 | | DONE |
|
|
|
t/c w eldon - permit ready
|
Permit Ready to Issue | | | 1/24/2011 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 1/24/2011 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 1/21/2011 | | |
|
|
|
|
Aging Inspection | 9/13/2011 | 9/13/2011 | | | |
Mike Jordan
|
|
|
|