Site Final | 8/30/2011 | 8/30/2011 | 8/30/2011 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 7/8/2011 | 7/8/2011 | 7/8/2011 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 6/30/2011 | 6/30/2011 | 6/30/2011 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 6/17/2011 | 6/17/2011 | 6/17/2011 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 6/13/2011 | 6/13/2011 | 6/13/2011 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 6/3/2011 | 6/3/2011 | 6/3/2011 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 5/31/2011 | 5/31/2011 | 5/31/2011 | P | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 3/30/2011 | 3/30/2011 | 3/30/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Provide approved inlet protection on thestorm drain to the north of the staging area. Remove the protection on the upper section of the mall area where there is no construction impact at this time.
|
General Inspection | 3/25/2011 | 3/25/2011 | 3/25/2011 | | FAIL |
Clint A Smith
|
|
|
Message to RP: POst ESC sign where it is visable from the front of the building.
|
Issue & PRINT permit COM | | | 3/24/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 2/3/2011 | | 2/3/2011 | | PASS |
Steven Webb
|
|
|
ESC plan waiver request is approved according to the ESC Permit conditions.
|
Application received | | | 1/28/2011 | | |
|
|
|
|