Site Preparation | 3/16/2011 | 4/19/2011 | 4/19/2011 | P | DONE |
Clint A Smith
|
|
|
PErmit finalled
|
DOC - Permit Finaled | 4/19/2011 | 4/19/2011 | 4/19/2011 | P | PASS |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 4/19/2011 | 4/19/2011 | 4/19/2011 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 4/15/2011 | 4/15/2011 | 4/15/2011 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 4/13/2011 | 4/13/2011 | 4/13/2011 | P | PASS |
Jim Storey
|
|
|
|
Site Preparation | 4/11/2011 | 4/11/2011 | 4/11/2011 | P | PASS |
Steven Webb
|
|
|
Drop inlet protected, had sweeping being performed during the site inspection. Sign Posted.
|
General Inspection | 3/16/2011 | 3/16/2011 | 3/16/2011 | | NR |
Steven Webb
|
|
|
Project has not started, RP (Bob) said probably the week of April 18th. Re-assigned an site preparation inspection for that time period.
|
Issue & PRINT permit COM | | | 3/15/2011 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/7/2011 | | 2/7/2011 | | PASS |
Steven Webb
|
|
|
ESC plan waiver is approved according to the ESC permit conditions.
|
Application received | | | 1/31/2011 | | |
|
|
|
|