General Inspection | 6/28/2012 | 6/28/2012 | 6/29/2012 | | PASS |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 6/29/2012 | 6/29/2012 | 6/29/2012 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/13/2012 | 6/13/2012 | 6/13/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/29/2012 | 5/29/2012 | 5/31/2012 | | PART |
Clint A Smith
|
|
|
starting to re establish vegitation.
|
General Inspection | 5/14/2012 | 5/14/2012 | 5/14/2012 | | PASS |
Clint A Smith
|
|
|
Spoke with RP ovr th stabilization methods applid and the re-application after flood waters receed. No violation found or concerns.
|
General Inspection | 4/12/2012 | 4/12/2012 | 4/16/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/8/2012 | 3/28/2012 | 3/28/2012 | A | PART |
Clint A Smith
|
|
|
RP will be attending the RP class tonight. Making him valid under the assumption that the RP passes the certification class.
|
General Inspection | 3/8/2012 | 3/8/2012 | 3/8/2012 | | PART |
Clint A Smith
|
|
|
Will be checking on the 28th for an upadated RP.
|
General Inspection | 2/22/2012 | 2/22/2012 | 2/22/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/7/2012 | 2/7/2012 | 2/7/2012 | | DONE |
Clint A Smith
|
|
|
Project is temporary stabilized.
|
General Inspection | 1/23/2012 | 1/23/2012 | 1/23/2012 | | PASS |
Clint A Smith
|
|
|
Waiting on stabiliztionto acheive
|
General Inspection | 1/8/2012 | 1/8/2012 | 1/9/2012 | | CANC |
Clint A Smith
|
|
|
weekend
|
General Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/8/2011 | 12/8/2011 | 12/8/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 11/23/2011 | 11/23/2011 | 11/28/2011 | | PASS |
Clint A Smith
|
|
|
Site is active and contained.
|
General Inspection | 11/2/2011 | 11/2/2011 | 11/2/2011 | | NR |
Daryl Spivey
|
|
|
no activity...........ds
|
General Inspection | 10/18/2011 | 10/18/2011 | 10/18/2011 | | DONE |
Clint A Smith
|
|
|
NO activity.
|
General Inspection | 10/3/2011 | 10/3/2011 | 10/3/2011 | | DONE |
Clint A Smith
|
|
|
No activity
|
General Inspection | 9/16/2011 | 9/16/2011 | 9/19/2011 | | PART |
Clint A Smith
|
|
|
No activity on that portion.
|
General Inspection | 9/1/2011 | 9/1/2011 | 9/1/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/17/2011 | 8/17/2011 | 8/17/2011 | | PASS |
Steven Webb
|
|
|
Unchanged, inactive site
|
General Inspection | 8/2/2011 | 8/2/2011 | 8/2/2011 | | PASS |
Steven Webb
|
|
|
Inactive site currently
|
General Inspection | 7/18/2011 | 7/18/2011 | 7/18/2011 | | PASS |
Steven Webb
|
|
|
unchanged
|
General Inspection | 7/1/2011 | 7/1/2011 | 7/1/2011 | | PASS |
Steven Webb
|
|
|
Unchanged, still not active.
|
General Inspection | 6/16/2011 | 6/16/2011 | 6/16/2011 | | PART |
Clint A Smith
|
|
|
Have not achieved stabilization requirements at this time.
|
General Inspection | 6/1/2011 | 6/1/2011 | 6/1/2011 | | PASS |
Steven Webb
|
|
|
Inactive, former area of disturbance is fully vegetated.
|
General Inspection | 5/17/2011 | 5/17/2011 | 5/17/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/2/2011 | 5/2/2011 | 5/2/2011 | | PASS |
Steven Webb
|
|
|
Site is not active, talked to RP not sure of the project schedule. RP will inquire and then send an e-mail to SGW with additional information.
|
General Inspection | 4/1/2011 | 4/1/2011 | 4/1/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/17/2011 | 3/17/2011 | 3/17/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/2/2011 | 3/2/2011 | 3/2/2011 | | PART |
Clint A Smith
|
|
|
Waiting on the hydroseeding to occur on all disturbed soil.
|
General Inspection | 2/15/2011 | 2/15/2011 | 2/15/2011 | P | PASS |
Steven Webb
|
|
|
Excavation and transporting of 800 cubic yards plus completed, (soils to Easter Simplot Park Bridge project). Sediment barriers in place.
|
General Inspection | 2/11/2011 | 2/11/2011 | 2/11/2011 | | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 2/10/2011 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Erosion and Sediment | 2/3/2011 | | 2/3/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions.
|
Routing - Erosion and Sediment | | | 2/2/2011 | | FAIL |
Steven Webb
|
|
|
ESC plan does not meet the requirements of BMC 8-17 or the CGP. Informed applicant that a re-submittal will be required. Talked to Kenn from the Wetlands Group
|
Application received | | | 2/1/2011 | | DONE |
Barbara Stitt
|
|
|
|
General Inspection | 4/27/2012 | 4/27/2012 | | | |
Clint A Smith
|
|
|
|