General Inspection | 12/10/2012 | 12/10/2012 | 12/10/2012 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 12/10/2012 | 12/10/2012 | 12/10/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 11/8/2012 | 11/8/2012 | 11/8/2012 | | PASS |
Clint A Smith
|
|
|
Most of the work is complete.
|
General Inspection | 10/8/2012 | 10/8/2012 | 10/9/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 9/5/2012 | 9/7/2012 | 9/10/2012 | A | PASS |
Clint A Smith
|
|
|
Project is mostly complete. Will be be appling a hydrolic seed, tach, mulch mixture on the small postions of disturded soil within the completed construction area.
|
General Inspection | 9/3/2012 | 9/3/2012 | 9/3/2012 | | CANC |
Steven Webb
|
|
|
Holiday
|
General Inspection | 7/2/2012 | 7/2/2012 | 7/30/2012 | | PASS |
Jim Sly
|
|
|
|
General Inspection | 4/30/2012 | 4/30/2012 | 4/30/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/26/2012 | 1/26/2012 | 1/26/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/26/2011 | 12/26/2011 | 12/27/2011 | A | CANC |
Steven Webb
|
|
|
Holiday
|
General Inspection | 11/25/2011 | 11/25/2011 | 11/25/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/17/2011 | 10/17/2011 | 10/19/2011 | | PASS |
Jack Frank
|
|
|
ok talked with contr. about dirt on hard surfaces, they will clean at end of day
|
General Inspection | 9/15/2011 | 9/15/2011 | 9/16/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/15/2011 | 8/15/2011 | 8/22/2011 | | CANC |
Jim Johnson
|
|
|
|
Random Inspection | 7/13/2011 | 7/13/2011 | 7/13/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
Site Preparation | 6/16/2011 | 6/16/2011 | 6/16/2011 | | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 6/13/2011 | | DONE |
|
|
|
|
Site Preparation | 5/16/2011 | 5/17/2011 | 5/17/2011 | A | PASS |
Clint A Smith
|
|
|
No other activity outside of erosion control can occur until permit have been issued within the build dept.
|
Site Preparation | 5/13/2011 | 5/16/2011 | 5/16/2011 | A | PART |
Clint A Smith
|
|
|
Permit was issued today. Will have a Site Preparation inspection on 5/17/2011 10:00am.
|
Issue & PRINT permit COM | | | 5/16/2011 | | DONE |
|
|
|
|
Site Preparation | 5/14/2011 | 5/16/2011 | 5/14/2011 | A | CANC |
Clint A Smith
|
|
|
|
Site Preparation | 5/13/2011 | 5/13/2011 | 5/14/2011 | P | CANC |
Clint A Smith
|
|
|
Wrong date
|
Routing - Erosion and Sediment | 2/2/2011 | | 2/3/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2011 | | |
|
|
|
|
Telephone call | | | 2/3/2011 | | DONE |
|
|
|
left message with jim for dave jenkins - permit ready
|
Permit Ready to Issue | | | 2/3/2011 | | DONE |
|
|
|
|
Application received | | | 2/2/2011 | | |
|
|
|
|
General Inspection | 8/2/2012 | 8/2/2012 | | | |
Jim Sly
|
|
|
|
General Inspection | 5/31/2012 | 5/31/2012 | | | |
Jim Sly
|
|
|
|
General Inspection | 3/29/2012 | 3/29/2012 | | | |
Clint A Smith
|
|
|
|
General Inspection | 2/27/2012 | 2/27/2012 | | | |
Jim Sly
|
|
|
|