Aging Inspection | 6/13/2012 | 6/13/2012 | 6/14/2012 | | PASS |
Eric Strole
|
|
|
|
DOC - Permit Finaled | 6/14/2012 | 6/14/2012 | 6/14/2012 | P | PASS |
Eric Strole
|
|
|
|
General Inspection | 4/13/2012 | 4/13/2012 | 4/13/2012 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 2/12/2012 | 2/12/2012 | 2/12/2012 | | CANC |
Clint A Smith
|
|
|
Weekend
|
General Inspection | 12/12/2011 | 12/12/2011 | 12/12/2011 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 10/10/2011 | 10/10/2011 | 10/10/2011 | | PART |
Clint A Smith
|
|
|
Pending correction notice on the vertical construction.
|
General Inspection | 8/10/2011 | 8/10/2011 | 8/10/2011 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 6/10/2011 | 6/10/2011 | 6/10/2011 | | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 6/7/2011 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/21/2011 | | 3/21/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2011 | | |
|
|
|
|
Telephone call | | | 3/21/2011 | | DONE |
|
|
|
t/c w todd - permit ready and fees given
|
Permit Ready to Issue | | | 3/21/2011 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/18/2011 | | 2/23/2011 | | FAIL |
Steven Webb
|
|
|
Plan failed due to the lack of the description of stabilization if the disturbed areas are going to be inactive for more than 14 days. Notified the PD if the correction and the submittal for the plan to pass. Plan will be in the pending box.
|
Application received | | | 2/18/2011 | | |
|
|
|
|