Site Final | 9/13/2011 | 9/15/2011 | 9/15/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 9/13/2011 | 9/13/2011 | 9/13/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 8/18/2011 | 8/18/2011 | 8/18/2011 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 7/18/2011 | 7/18/2011 | 7/18/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 6/27/2011 | 6/27/2011 | 6/27/2011 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 5/26/2011 | 5/26/2011 | 5/26/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
Site Preparation | 5/16/2011 | 5/17/2011 | 5/17/2011 | A | PART |
Clint A Smith
|
|
|
Prior to any concrete placing, need to provide a non storm water pollutant washout.
|
Site Preparation | 5/16/2011 | 5/16/2011 | 5/16/2011 | | CANC |
Clint A Smith
|
|
|
Moved until 5/17/2011am. Meeting with RP for a plan review.
|
Issue & PRINT permit COM | | | 5/13/2011 | | |
|
|
|
|
Routing - Erosion and Sediment | 3/4/2011 | | 3/4/2011 | | PASS |
Clint A Smith
|
|
|
ESC plan approved per the attached conditions
|
Application received | | | 3/2/2011 | | |
|
|
|
|