Site Final | 6/24/2011 | 6/24/2011 | 6/24/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 4/29/2011 | 4/29/2011 | 4/29/2011 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 4/28/2011 | 4/28/2011 | 4/28/2011 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 4/28/2011 | 4/28/2011 | 4/28/2011 | A | PASS |
Troy James
|
|
|
|
Random Inspection | 4/11/2011 | 4/11/2011 | 4/11/2011 | P | PART |
Jim Storey
|
|
|
460 v/c/n
|
Site Preparation | 4/11/2011 | 4/11/2011 | 4/11/2011 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Approved for the footing pour to clean uot on the garage. Must clean up all residual a spoils after the time of back fill. Also at that time to provide a non storm water washout.
|
Permit Ready to Issue | | | 4/8/2011 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 4/8/2011 | | DONE |
|
|
|
|
Application received | | | 3/22/2011 | | |
|
|
|
|