General Inspection | 1/26/2012 | 1/26/2012 | 1/27/2012 | | PASS |
Daryl DeGrange
|
|
|
see final
|
Site Final | 1/27/2012 | 1/27/2012 | 1/27/2012 | P | PASS |
Daryl DeGrange
|
|
|
job site clean, completed, ground covered with sod final ok
|
General Inspection | 12/26/2011 | 12/26/2011 | 12/27/2011 | | CANC |
Steven Webb
|
|
|
Holiday
|
General Inspection | 11/24/2011 | 11/24/2011 | 11/25/2011 | | CANC |
Clint A Smith
|
|
|
Holiday
|
General Inspection | 10/20/2011 | 10/20/2011 | 10/20/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/19/2011 | 9/19/2011 | 9/19/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/19/2011 | 8/19/2011 | 8/19/2011 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/15/2011 | 7/19/2011 | 7/19/2011 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/15/2011 | 7/15/2011 | 7/15/2011 | | NR |
Clint A Smith
|
|
|
|
Site Preparation | 6/10/2011 | 6/14/2011 | 6/14/2011 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 6/10/2011 | 6/10/2011 | 6/10/2011 | | NR |
Clint A Smith
|
|
|
Left a message ith RP to contact the city over the location and the start dat of the project. Will follow up on 6/14/2011.
|
Issue & PRINT permit COM | | | 6/7/2011 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/4/2011 | | 5/4/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC Plan and ESC permit conditions.
|
Routing - Erosion and Sediment | 4/13/2011 | | 4/13/2011 | | FAIL |
Steven Webb
|
|
|
ESC plan does not meet requirements per BMC 8-17 or the Plan Designer Manual. Re-submittal is needed.
|
Application received | | | 4/1/2011 | | DONE |
Barbara Stitt
|
|
|
|