DOC - Permit Finaled | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/14/2011 | 4/14/2011 | 4/14/2011 | P | PASS |
Steven Webb
|
|
|
Ponds have been drained, hand mixing of concrete on visqueen was occurring during inspection. Sign posted.
|
Site Preparation | 4/7/2011 | 4/7/2011 | 4/7/2011 | | PASS |
Steven Webb
|
|
|
|
Routing - Erosion and Sediment | 4/1/2011 | | 4/4/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/4/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 4/4/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 4/4/2011 | | DONE |
Tisha Gallop
|
|
|
called Chris Waldram and told him permit is ready.
|
Issue & PRINT permit COM | | | 4/4/2011 | | DONE |
|
|
|
|
Application received | | | 4/1/2011 | | DONE |
Barbara Stitt
|
|
|
|