General Inspection | 6/20/2013 | 6/20/2013 | 6/21/2013 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 6/20/2013 | 6/20/2013 | 6/20/2013 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/20/2013 | 5/20/2013 | 5/21/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 4/18/2013 | 4/18/2013 | 4/19/2013 | | PASS |
Bill VanDegrift
|
|
|
job is almost complete, road mix ramp was approved sand bags inplace, minor rain today then clear for the next week should be about done with project by then.
|
General Inspection | 3/18/2013 | 3/18/2013 | 3/18/2013 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 2/14/2013 | 2/14/2013 | 2/14/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/14/2013 | 1/14/2013 | 1/15/2013 | | PASS |
Daryl Spivey
|
|
|
|
BMP Violation | 12/10/2012 | 12/14/2012 | 12/17/2012 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/10/2012 | 12/10/2012 | 12/10/2012 | | FAIL |
Clint A Smith
|
|
|
Message to RP: provide a sediment barrier along the westside of lot where accessing the back of the lot. Replace the ramp with non erodible products. Post ESC sign where visable from the street. Will follow up 0n 12/14/2012 a.m.
|
Random Inspection | 11/8/2012 | 11/9/2012 | 11/9/2012 | A | PART |
Jim Sly
|
|
|
Brett phone Talked to Brett about function of pipe in gutter with gravel overi it. Cannot have unless inlet of pipe is protected enough as to not allow any water around fill.
|
Site Final | 11/8/2012 | 11/9/2012 | 11/8/2012 | A | CANC |
Jim Sly
|
|
|
Brett phone
|
General Inspection | 10/15/2012 | 10/15/2012 | 10/16/2012 | | PASS |
Dixie Fellows
|
|
|
storm drains have been protected..sand bags in place at soil disturbance
|
(F) Reprint permit | | | 9/27/2012 | | DONE |
Barbara Stitt
|
|
|
|
Fees Due Hold | 9/14/2012 | | 9/27/2012 | | DONE |
Barbara Stitt
|
|
|
|
Aging Inspection | 9/14/2012 | 9/14/2012 | 9/14/2012 | | NR |
Kimberly M. Johnson
|
|
|
|
Change Status (ISS) | | | 9/13/2012 | | DONE |
Barbara Stitt
|
|
|
building permit is still open and active jsut changed from homeowner to gc on 9-14-12//BAS
|
General Inspection | 10/3/2011 | 10/3/2011 | 10/4/2011 | | PASS |
Daryl DeGrange
|
|
|
see final
|
Site Final | 10/4/2011 | 10/4/2011 | 10/4/2011 | P | PASS |
Daryl DeGrange
|
|
|
site clean, landscaping in,filters have been removed
|
General Inspection | 9/1/2011 | 9/1/2011 | 9/7/2011 | | PASS |
Daryl DeGrange
|
|
|
asked contractor to sweep up gutter, was taken care of right away.
|
Site Preparation | 7/31/2011 | 8/1/2011 | 8/1/2011 | A | NR |
Tony Young
|
|
|
|
General Inspection | 7/25/2011 | 7/25/2011 | 8/1/2011 | | PEND |
Tony Young
|
|
|
|
General Inspection | 6/23/2011 | 6/23/2011 | 6/23/2011 | | NR |
Clint A Smith
|
|
|
|
Site Preparation | 5/16/2011 | 5/23/2011 | 5/23/2011 | A | NR |
Clint A Smith
|
|
|
|
General Inspection | 5/16/2011 | 5/16/2011 | 5/16/2011 | | NR |
Clint A Smith
|
|
|
Will re-inspect on 5/23/2011
|
General Inspection | 4/13/2011 | 4/13/2011 | 4/13/2011 | | NR |
Steven Webb
|
|
|
Site Preparation inspection not general. Talked to RP, project to start in a few weeks.
|
Issue & PRINT permit SFD | | | 4/11/2011 | | DONE |
|
|
|
|
Application received | | | 4/8/2011 | | |
|
|
|
|