Site Final | 8/12/2011 | 8/12/2011 | 8/12/2011 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 8/12/2011 | 8/12/2011 | 8/12/2011 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 6/8/2011 | 6/8/2011 | 6/8/2011 | A | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 6/6/2011 | 6/6/2011 | 6/6/2011 | P | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 6/3/2011 | 6/3/2011 | 6/3/2011 | P | FAIL |
Mike Jordan
|
|
|
Trash contianer has been repaired. Still needs to sweep silts from hard surfaces.
|
General Inspection | 6/2/2011 | 6/2/2011 | 6/2/2011 | P | FAIL |
Mike Jordan
|
|
|
Needs to sweep all hardsurfaces of silts. Provide an approved container for all blowable trash.
|
BMP Violation | 5/6/2011 | 5/6/2011 | 5/6/2011 | A | PART |
Mike Jordan
|
|
|
Still needs to post ESC sign and sweep gutter pan. Verbal correction notice to RP adn no concrete until all corrections are made.
|
Site Preparation | 5/5/2011 | 5/5/2011 | 5/5/2011 | P | PART |
Mike Jordan
|
|
|
Needs to post ESC sign and sweep all silts from gutter pan. RP notified with verbal correction notice via phone call.
|
Issue & PRINT permit SFD | | | 5/4/2011 | | DONE |
|
|
|
|
Application received | | | 4/13/2011 | | |
|
|
|
|