Site Final | 9/20/2011 | 9/20/2011 | 9/20/2011 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 9/20/2011 | 9/20/2011 | 9/20/2011 | P | PASS |
Mike Jordan
|
|
|
Fianl stabalization completed.
|
Site Final | 9/8/2011 | 9/8/2011 | 9/8/2011 | A | FAIL |
Mike Jordan
|
|
|
Final stabalization not yet completed.
|
Random Inspection | 7/18/2011 | 7/18/2011 | 7/18/2011 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 7/15/2011 | 7/15/2011 | 7/15/2011 | P | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 7/13/2011 | 7/13/2011 | 7/13/2011 | A | PASS |
Mike Jordan
|
|
|
|
General Inspection | 7/7/2011 | 7/7/2011 | 7/7/2011 | P | PART |
Mike Jordan
|
|
|
Needs to sweep all silts from har surfaces. Correction notice was posted.
|
Random Inspection | 6/10/2011 | 6/10/2011 | 6/10/2011 | A | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 6/9/2011 | 6/9/2011 | 6/9/2011 | A | PASS |
Mike Jordan
|
|
|
BMP's have been installed.
|
Site Preparation | 6/8/2011 | 6/8/2011 | 6/8/2011 | P | PART |
Mike Jordan
|
|
|
Needs to provide washout and provide sediment BMP at front of lot. RP notified by verbal correction notice.
|
Site Preparation | 5/27/2011 | 5/27/2011 | 5/27/2011 | | FAIL |
Clint A Smith
|
|
|
Need to post ESC sign
|
Issue & PRINT permit SFD | | | 5/24/2011 | | DONE |
|
|
|
|
Application received | | | 4/27/2011 | | |
|
|
|
|