General Inspection | 6/30/2011 | 6/30/2011 | 6/30/2011 | | DONE |
Clint A Smith
|
|
|
Permit finaled
|
DOC - Permit Finaled | 6/30/2011 | 6/30/2011 | 6/30/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/15/2011 | 6/15/2011 | 6/15/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/27/2011 | 5/31/2011 | 5/31/2011 | A | PASS |
Clint A Smith
|
|
|
Have installed a plastic barrier where the water would discharge. The barrier will be removed once the sediment has settled out.
|
General Inspection | 5/27/2011 | 5/27/2011 | 5/27/2011 | | PART |
Clint A Smith
|
|
|
Work is complete. Will re-inspect on 5/31/2011 to see if discharging is occuring.
|
Site Preparation | 5/12/2011 | 5/12/2011 | 5/12/2011 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Post ESC sign at the front of the project area where visable from the street.
|
Issue & PRINT permit COM | | | 5/9/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 5/4/2011 | | 5/5/2011 | | PASS |
Steven Webb
|
|
|
ESC plan waiver is approved according to the ESC Permit Condiitions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/5/2011 | | |
|
|
|
|
Telephone call | | | 5/5/2011 | | DONE |
|
|
|
left vm for isaac - permit ready and fees given
|
Permit Ready to Issue | | | 5/5/2011 | | DONE |
|
|
|
|
Application received | | | 5/4/2011 | | |
|
|
|
|