General Inspection | 9/20/2011 | 9/20/2011 | 9/20/2011 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 9/20/2011 | 9/20/2011 | 9/20/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/18/2011 | 8/18/2011 | 8/18/2011 | | PASS |
Steven Webb
|
|
|
Retaingin wall appears to be completed and slope has have mulch applied; waitng on growth and then permit may be finaled.
|
Random Inspection | 7/18/2011 | 7/18/2011 | 7/18/2011 | P | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 7/11/2011 | 7/15/2011 | 7/15/2011 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/7/2011 | 7/11/2011 | 7/11/2011 | A | NR |
Clint A Smith
|
|
|
Waiting on a permit from ACHD for flagging to occur.
|
Site Preparation | 6/23/2011 | 7/7/2011 | 7/7/2011 | A | NR |
Clint A Smith
|
|
|
RP will meet with me on 7/11/2011 at 10AM.
|
General Inspection | 6/23/2011 | 6/23/2011 | 6/23/2011 | | NR |
Clint A Smith
|
|
|
Will conduct a site prep. inspection on 7/7/2011am. Work will not start until 7/5/2011 per what the RP has informed.
|
Site Preparation | 5/9/2011 | 5/23/2011 | 5/23/2011 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/9/2011 | 5/9/2011 | 5/9/2011 | | NR |
Clint A Smith
|
|
|
TOld by contractor that they will not begin the project until the weather begins to dry up and the soil is not so saturated. Expected to begin on the 23rd of May. Will re-inspect on 5/23/2011
|
Application received | | | 5/6/2011 | | |
|
|
|
|
Routing - Erosion and Sediment | 5/6/2011 | | 5/6/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC Plan and ESC Permit Conditions.
|
Issue & PRINT permit SFD | | | 5/6/2011 | | DONE |
|
|
|
|