Site Final | 1/24/2012 | 1/24/2012 | 1/24/2012 | P | PASS |
Dixie Fellows
|
|
|
building permit is finaled
|
Aging Inspection | 1/24/2012 | 1/24/2012 | 1/24/2012 | | PEND |
Dixie Fellows
|
|
|
scheduled for a final
|
Aging Inspection | 11/24/2011 | 11/24/2011 | 11/25/2011 | | CANC |
Clint A Smith
|
|
|
Holiday
|
Aging Inspection | 9/20/2011 | 9/20/2011 | 9/22/2011 | | PASS |
Dixie Fellows
|
|
|
site ok...wip
|
BMP Violation | 7/20/2011 | 7/21/2011 | 7/21/2011 | A | PASS |
Dave Hannah
|
|
|
|
BMP Violation | 7/18/2011 | 7/20/2011 | 7/20/2011 | A | FAIL |
Tony Young
|
|
|
correction posted
|
General Inspection | 7/18/2011 | 7/18/2011 | 7/19/2011 | P | FAIL |
Tony Young
|
|
|
correction posted,, clean up
|
BMP Violation | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | PART |
Clint A Smith
|
|
|
Verbal tp RP: Back fill on the flap og the Gator Gaurd sediment barrier to keep the product weighted down. Also install the storm drain inlet protection on other side of the street.
|
Site Preparation | 5/26/2011 | 5/26/2011 | 5/26/2011 | P | FAIL |
Tony Young
|
|
|
see 460 notes,, same
|
Site Preparation | 5/26/2011 | 5/26/2011 | 5/26/2011 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Must provides sediment barriers at front and back of lot due to the stockpiles staged at property perimeter. Also Provide a washout prior to the pouring of anymore concrete.
|
Issue & PRINT permit SFD | | | 5/23/2011 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 5/9/2011 | | |
|
|
|
|