Site Final | 2/15/2012 | 2/16/2012 | 2/16/2012 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 2/16/2012 | 2/16/2012 | 2/16/2012 | P | PASS |
Mike Jordan
|
|
|
|
Aging Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 | | CANC |
Clint A Smith
|
|
|
Lack of inspectors.
|
General Inspection | 10/17/2011 | 10/17/2011 | 10/18/2011 | | PASS |
Jim Johnson
|
|
|
|
General Inspection | 8/16/2011 | 8/16/2011 | 8/16/2011 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 8/2/2011 | 8/2/2011 | 8/2/2011 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 7/26/2011 | 7/26/2011 | 7/26/2011 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 7/18/2011 | 7/18/2011 | 7/18/2011 | A | PASS |
Mike Jordan
|
|
|
|
General Inspection | 7/12/2011 | 7/14/2011 | 7/14/2011 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/5/2011 | 7/12/2011 | 7/12/2011 | A | FAIL |
Clint A Smith
|
|
|
Verbal to General Contractor: Add the RP's cell phone number to the information on the RP listing. ALso to post the ESC at thee front of the building. Will re-inspect on 7/14/2011am
|
Site Preparation | 7/4/2011 | 7/4/2011 | 7/5/2011 | | NR |
Clint A Smith
|
|
|
Will re-inspect on 7/12/2011AM.
|
Issue & PRINT permit COM | | | 7/1/2011 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/23/2011 | | 6/23/2011 | | DONE |
Tim L. Woodard
|
|
|
Waiver Letter approved. Applicant must comply with attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/23/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | | 5/31/2011 | | |
|
|
|
|