Aging Inspection | 6/26/2012 | 6/26/2012 | 6/26/2012 | | DONE |
Clint A Smith
|
|
|
PErmit finaled.
|
DOC - Permit Finaled | 6/26/2012 | 6/26/2012 | 6/26/2012 | P | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 4/24/2012 | 4/24/2012 | 4/25/2012 | | PASS |
Jim Johnson
|
|
|
|
Site Final | 12/23/2011 | 3/23/2012 | 3/23/2012 | A | FAIL |
Jim Sly
|
|
|
Need to complete landscaping.
|
Aging Inspection | 2/22/2012 | 2/22/2012 | 2/22/2012 | | PASS |
Clint A Smith
|
|
|
|
Site Final | 12/23/2011 | 12/23/2011 | 12/27/2011 | P | FAIL |
Jim Sly
|
|
|
Robert phone Need to complete landscaping.
|
Aging Inspection | 12/8/2011 | 12/8/2011 | 12/8/2011 | | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 9/29/2011 | 9/29/2011 | 9/29/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/27/2011 | 8/5/2011 | 8/5/2011 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/28/2011 | 8/4/2011 | 8/4/2011 | A | PASS |
Clint A Smith
|
|
|
RP??
|
General Inspection | 7/26/2011 | 7/27/2011 | 7/28/2011 | P | PASS |
Clint A Smith
|
|
|
Will check on RP status on 8/5/2011.
|
General Inspection | 7/22/2011 | 7/26/2011 | 7/26/2011 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Provide a washout pit for the duration of the project for all non stormwater polluntants to be cleaned out with9in the provided washout pit. Secure the ESC yellow sign on the wood fence going into the project area.
Explained to the RP that the general contractor must provide an RP for the full duration of the project. Someone who has day to day control of all erosion and sediment conrtol issues pertaining to the project. If one can not be provided a Stop Work Order will be placed on the project until the time being a valid RP is provided. Will re-inspect on 7/27/2011PM.
|
Site Preparation | 7/8/2011 | 7/8/2011 | 7/19/2011 | | DONE |
Tom Arcoraci
|
|
|
|
Random Inspection | 7/18/2011 | 7/18/2011 | 7/18/2011 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 7/14/2011 | 7/14/2011 | 7/14/2011 | A | PART |
Mike Jordan
|
|
|
Needs to provide washout.
|
Issue & PRINT permit SFD | | | 7/5/2011 | | DONE |
|
|
|
|
Application received | | | 6/13/2011 | | |
|
|
|
|