Site Final | 7/8/2011 | 7/12/2011 | 7/12/2011 | A | PASS |
Clint A Smith
|
|
|
|
Site Final | 7/6/2011 | 7/7/2011 | 7/8/2011 | P | NR |
Clint A Smith
|
|
|
Need to compplete asphalt patch.
|
General Inspection | 7/5/2011 | 7/6/2011 | 7/6/2011 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 6/28/2011 | 7/5/2011 | 7/5/2011 | P | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 6/28/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 6/24/2011 | | 6/27/2011 | | PASS |
Clint A Smith
|
|
|
ESC plan waiver approved with condittions attached to the permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2011 | | |
Clint A Smith
|
|
|
|
Permit Ready to Issue | | | 6/27/2011 | | |
Barbara Stitt
|
|
|
|
Telephone call | | | 6/27/2011 | | DONE |
Barbara Stitt
|
|
|
Called Dana and told him that permit is ready & fees due on 6-27-11 @ 2:15pm//BAS
|
Application received | | | 6/24/2011 | | DONE |
Barbara Stitt
|
|
|
|