Site Final | 2/1/2012 | 2/1/2012 | 2/1/2012 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 2/1/2012 | 2/1/2012 | 2/1/2012 | P | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 12/8/2011 | 12/9/2011 | 12/12/2011 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 12/2/2011 | 12/2/2011 | 12/8/2011 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: PRoect the storm drain to the north of the project lot. Post ESC where visable from the street. Will follow up on 12/9/2011 PM.
|
Random Inspection | 12/6/2011 | 12/6/2011 | 12/6/2011 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 12/5/2011 | 12/5/2011 | 12/5/2011 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 12/2/2011 | 12/2/2011 | 12/2/2011 | P | NR |
Mike Jordan
|
|
|
|
Issue & PRINT permit SFD | | | 11/29/2011 | | DONE |
|
|
|
|
Application received | | | 6/28/2011 | | |
|
|
|
|