Aging Inspection | 9/22/2011 | 9/22/2011 | 9/22/2011 | | DONE |
Clint A Smith
|
|
|
Permit Finaled.
|
DOC - Permit Finaled | 9/22/2011 | 9/22/2011 | 9/22/2011 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 7/19/2011 | 7/20/2011 | 7/20/2011 | A | CANC |
Clint A Smith
|
|
|
|
General Inspection | 7/20/2011 | 7/20/2011 | 7/20/2011 | P | PASS |
Steven Webb
|
|
|
After much conversation a stop work order was issued by code enforcement for failure to have a drainage plan and DR approvals. After appeal by owner due to miscommunication the stop work was lifted and its ok for the contractor to grade and pave out. ESC controls are ok, no problems observed.
|
Site Preparation | 7/15/2011 | 7/19/2011 | 7/19/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Replace the inlet protection (fiter fabric) with an approved storm drain inlet protection. Will Re-inspect on 7/20/2011 AM.
|
Site Preparation | 7/15/2011 | 7/15/2011 | 7/15/2011 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 7/12/2011 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 7/6/2011 | | |
|
|
|
|
Routing - Erosion and Sediment | 7/6/2011 | | 7/6/2011 | | PASS |
Steven Webb
|
|
|
ESC plan waiver request is approved according to the ESC Permit conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2011 | | |
|
|
|
|
Telephone call | | | 7/6/2011 | | DONE |
|
|
|
left vm for george - permit ready and fees given
|
Permit Ready to Issue | | | 7/6/2011 | | DONE |
|
|
|
|