Site Final | 11/15/2011 | 11/15/2011 | 11/15/2011 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 11/15/2011 | 11/15/2011 | 11/15/2011 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 10/18/2011 | 10/18/2011 | 10/19/2011 | | PASS |
Jim Storey
|
|
|
|
BMP Violation | 8/17/2011 | 8/18/2011 | 8/18/2011 | A | PART |
Clint A Smith
|
|
|
Willhave the stabilized exit next week.
|
BMP Violation | 8/12/2011 | 8/17/2011 | 8/17/2011 | A | CANC |
Clint A Smith
|
|
|
Wrong date.
|
Site Preparation | 8/12/2011 | 8/12/2011 | 8/12/2011 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install a stabilized construction exit. Re-install the sediment barrier along the drainage field. Will re-inspect on 8/17/2011
|
Permit Ready to Issue | | | 8/9/2011 | | DONE |
Barbara Stitt
|
|
|
|
Issue & PRINT permit COM | | | 8/9/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 8/5/2011 | | 8/5/2011 | | PASS |
Steven Webb
|
|
|
ESC plan and narrative approved including the test track and building addition.
|
Application received | | | 7/13/2011 | | |
|
|
|
|
Routing - Erosion and Sediment | 7/13/2011 | | 7/13/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions. Reviewed via ProjectDox, no routing needed.
|