Aging Inspection | 6/18/2012 | 6/18/2012 | 6/19/2012 | | DONE |
Clint A Smith
|
|
|
PErmit finaled.
|
DOC - Permit Finaled | 6/19/2012 | 6/19/2012 | 6/19/2012 | A | PASS |
Clint A Smith
|
|
|
|
Aging Inspection | 4/16/2012 | 4/16/2012 | 4/16/2012 | | PASS |
Daryl Spivey
|
|
|
|
Aging Inspection | 12/14/2011 | 12/14/2011 | 12/15/2011 | | PEND |
Tony Young
|
|
|
|
Aging Inspection | 9/30/2011 | 9/30/2011 | 10/11/2011 | | PASS |
Tony Young
|
|
|
|
Tracking Control | 7/29/2011 | 8/2/2011 | 8/2/2011 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/29/2011 | 7/29/2011 | 7/29/2011 | | FAIL |
Clint A Smith
|
|
|
Verbal to Contractor: RP is out until 15th.
Install a stabilized construction exit per the approved methods. Clean up all tracking out of the staging area. Will follow up on 8/2/2011AM.
|
Routing - Erosion and Sediment | 7/26/2011 | | 7/26/2011 | | DONE |
Clint A Smith
|
|
|
ESC plan waiver approved with conditions attached to the permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/26/2011 | | |
|
|
|
|
Telephone call | | | 7/26/2011 | | DONE |
Christina Prado
|
|
|
Called Mike with Owyhee Const to give fees due
|
Permit Ready to Issue | | | 7/26/2011 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 7/26/2011 | | DONE |
|
|
|
|
Application received | | | 7/25/2011 | | |
|
|
|
|
Aging Inspection | 2/14/2012 | 2/14/2012 | | | |
Daryl DeGrange
|
|
|
|