Site Final | 10/13/2011 | 10/13/2011 | 10/13/2011 | A | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 10/13/2011 | 10/13/2011 | 10/13/2011 | P | PASS |
Jim Storey
|
|
|
|
BMP Violation | 10/6/2011 | 10/7/2011 | 10/7/2011 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice: Clean up all sediment and debris off all hard surfaces. Do not allow parkinh on the disturbed soil or provide a stabilized parking pad. **Failure to comply will result in a stop work order. Will re-inspect on 10/10/2011AM.
|
BMP Violation | 10/6/2011 | 10/6/2011 | 10/6/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: CLean up all sediment and debris off of all hard surfaces. Try to miniumize any turbid discharge for of the disturb soil on the lot to the gutterpan. Recommended to add double external protection to the storm drain inlet. Will follow up on 10/7/2011.
|
BMP Violation | 9/26/2011 | 9/28/2011 | 9/28/2011 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 9/26/2011 | 9/26/2011 | 9/26/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: CLean up all sediment off of all hard surfaces. Remove or relocate all trash debris into provided waste boxes. Remove all stucco wash off of the lots. Will re-inspect on 9/28/2011am.
|
General Inspection | 9/8/2011 | 9/8/2011 | 9/8/2011 | P | PART |
Tony Young
|
|
|
daily clean up
|
Random Inspection | 8/17/2011 | 8/17/2011 | 8/17/2011 | A | PART |
Jim Storey
|
|
|
need inlet protection
|
Issue & PRINT permit SFD | | | 8/16/2011 | | |
Barbara Stitt
|
|
|
|
Application received | | | 8/3/2011 | | |
|
|
|
|