Site Final | 6/11/2012 | 6/11/2012 | 6/11/2012 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 6/11/2012 | 6/11/2012 | 6/11/2012 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 5/16/2012 | 5/16/2012 | 5/16/2012 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 4/30/2012 | 4/30/2012 | 4/30/2012 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 4/25/2012 | 4/25/2012 | 4/25/2012 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 4/16/2012 | 4/16/2012 | 4/16/2012 | P | PASS |
Jim Storey
|
|
|
|
Site Preparation | 4/10/2012 | 4/10/2012 | 4/10/2012 | A | PASS |
Eric Strole
|
|
|
|
General Inspection | 4/10/2012 | 4/10/2012 | 4/10/2012 | | CANC |
Eric Strole
|
|
|
|
Issue & PRINT permit COM | | | 4/5/2012 | | |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 10/25/2011 | | 10/25/2011 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with conditions attached to the permit.
|
Application received | | | 8/5/2011 | | |
|
|
|
|