General Inspection | 4/18/2013 | 4/18/2013 | 4/18/2013 | | DONE |
Clint A Smith
|
|
|
Permit finaled
|
DOC - Permit Finaled | 4/18/2013 | 4/18/2013 | 4/18/2013 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/18/2013 | 3/18/2013 | 3/18/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/14/2013 | 2/14/2013 | 2/14/2013 | | PART |
Clint A Smith
|
|
|
Thisportion of the permikt if under vertical construction. But not all lots have begun vertical construction. Cannot final out permit.
|
General Inspection | 1/14/2013 | 1/14/2013 | 1/14/2013 | | PART |
Clint A Smith
|
|
|
Developement complete. But have not achieved our requirements of final stabilization. Can not final permit if you have not achieved the final stabilization requirements.
|
General Inspection | 12/13/2012 | 12/13/2012 | 12/13/2012 | | PART |
Clint A Smith
|
|
|
Mostly of the lots are in vertical construction.
|
General Inspection | 11/12/2012 | 11/12/2012 | 11/13/2012 | | CANC |
Steven Webb
|
|
|
holiday
|
General Inspection | 10/11/2012 | 10/11/2012 | 10/11/2012 | | PASS |
Kimberly M. Johnson
|
|
|
|
General Inspection | 9/10/2012 | 9/10/2012 | 9/10/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/9/2012 | 8/9/2012 | 8/9/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/9/2012 | 7/9/2012 | 7/9/2012 | | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 6/6/2012 | 6/6/2012 | 6/6/2012 | A | PASS |
Clint A Smith
|
|
|
Wrong permit. Site looks good though.
|
General Inspection | 5/17/2012 | 5/17/2012 | 5/17/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/16/2012 | 4/16/2012 | 4/16/2012 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 3/15/2012 | 3/15/2012 | 3/15/2012 | | PASS |
Clint A Smith
|
|
|
No actvity due to weather conditions.
|
General Inspection | 2/13/2012 | 2/13/2012 | 2/13/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/13/2012 | 1/13/2012 | 1/13/2012 | | PASS |
Clint A Smith
|
|
|
No activity.
|
General Inspection | 12/13/2011 | 12/13/2011 | 12/13/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/24/2011 | 10/24/2011 | 10/24/2011 | | PART |
Clint A Smith
|
|
|
|
General Inspection | 9/22/2011 | 9/22/2011 | 9/22/2011 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 8/22/2011 | 8/22/2011 | 8/22/2011 | | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit SFD | | | 8/19/2011 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/18/2011 | | 8/18/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and the ESC permit conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/2011 | | |
|
|
|
|
Telephone call | | | 8/18/2011 | | DONE |
|
|
|
left vm for randy - permit ready and fees given
|
Permit Ready to Issue | | | 8/18/2011 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/17/2011 | | 8/17/2011 | | FAIL |
Steven Webb
|
|
|
Informed Plan Designer that the construction schedule and dewatering plan is missing from the narrative and both are needed to continue with the review. Re-submittal is needed. ESC plan is located in ESC Pending Box
|
Application received | | | 8/16/2011 | | |
|
|
|
|
Routing - Erosion and Sediment | 8/16/2011 | | | | PEND |
|
|
|
|