Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC11-00609
StatusFinaled
Name ROBERT BRUNO
Site Address 5870 E MILLET DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/19/20127/19/20127/19/2012 DONE
DetailsClint A Smith
Permit finaled.
DOC - Permit Finaled7/19/20127/19/20127/19/2012PPASS
DetailsClint A Smith
General Inspection6/18/20126/18/20126/18/2012 PASS
DetailsClint A Smith
General Inspection5/17/20125/17/20125/17/2012 PART
DetailsClint A Smith
Need to keep up on cleaning on a daily basis.
BMP Violation3/15/20123/16/20123/16/2012APASS
DetailsClint A Smith
All corrections made
General Inspection3/15/20123/15/20123/15/2012 FAIL
DetailsClint A Smith
Message to RP:
Cleanup the sediment discharge offo f the hardsurfaces where a concerated flow was generated at the driveway and wattle meet. Install an additional sediment barrier to minumize any additional turbid discharges off of the disturbed soil onto the sidewalk to the gutterpan. Will follow up on 3/16/2012.
General Inspection2/13/20122/13/20122/15/2012 PASS
DetailsDave Hannah
General Inspection1/13/20121/13/20121/13/2012 PASS
DetailsClint A Smith
General Inspection12/13/201112/13/201112/14/2011 PASS
DetailsClint A Smith
General Inspection11/9/201111/9/201111/10/2011 PASS
DetailsClint A Smith
Random Inspection10/7/201110/7/201110/7/2011PPASS
DetailsTom Arcoraci
BMP Violation9/30/201110/3/201110/3/2011APART
DetailsClint A Smith
Additional BMP's have been installed. Must wait until weather occurs to see if the BMP's will work correctly.
General Inspection9/30/20119/30/20119/30/2011AFAIL
DetailsClint A Smith
Message to RP;
Provide and maintain sediment barries along the fron of project area. Will re-inspect on 10/3/2011am
Site Preparation9/12/20119/13/20119/14/2011APART
DetailsClint A Smith
Verbal to RP:
Post ESC sign at the front of the project where it is visable from the street.
Site Preparation9/12/20119/12/20119/12/2011 NR
DetailsClint A Smith
Just doing layouts today.
Issue & PRINT permit SFD  9/9/2011 DONE
Permit Ready to Issue  9/7/2011 DONE
DetailsBarbara Stitt
Routing - Erosion and Sediment8/31/2011 8/31/2011 PASS
DetailsClint A Smith
ESC plan approved with conditions attached to the permit.
Application received  8/23/2011  
General Inspection4/16/20124/16/2012   
DetailsDaryl DeGrange