Site Final | 6/29/2012 | 6/29/2012 | 6/29/2012 | P | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 6/29/2012 | 6/29/2012 | 6/29/2012 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 6/18/2012 | 6/18/2012 | 6/18/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/16/2012 | 4/16/2012 | 4/16/2012 | A | PASS |
Dave Hannah
|
|
|
|
General Inspection | 3/19/2012 | 3/19/2012 | 3/26/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/18/2012 | 1/18/2012 | 1/18/2012 | | PART |
Clint A Smith
|
|
|
No activity due to snow conditions.
|
General Inspection | 11/18/2011 | 11/18/2011 | 11/18/2011 | A | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 10/20/2011 | 10/20/2011 | 10/20/2011 | | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 10/17/2011 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 10/13/2011 | | 10/13/2011 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with conditions attached to the permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2011 | | FAIL |
|
|
|
Must submit a plan with the plan narrative . Left a message with applicant over the correction.
|
Application received | | | 8/24/2011 | | |
|
|
|
|