General Inspection | 9/4/2012 | 9/4/2012 | 9/4/2012 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 9/4/2012 | 9/4/2012 | 9/4/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/17/2012 | 7/17/2012 | 7/20/2012 | | PASS |
Jim Storey
|
|
|
|
General Inspection | 6/1/2012 | 6/1/2012 | 6/1/2012 | | DONE |
Jim Storey
|
|
|
|
General Inspection | 2/28/2012 | 2/28/2012 | 2/29/2012 | | PASS |
Eric Strole
|
|
|
|
Site Preparation | 1/13/2012 | 1/13/2012 | 1/17/2012 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 1/12/2012 | 1/12/2012 | 1/13/2012 | | DEFR |
Jim Storey
|
|
|
|
Issue & PRINT permit COM | | | 1/9/2012 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/13/2011 | | 12/13/2011 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with conditions attached to the permit.
|
Application received | | | 9/2/2011 | | |
|
|
|
|
General Inspection | 4/16/2012 | 4/16/2012 | | | |
Jim Storey
|
|
|
|
Routing - Erosion and Sediment | 9/13/2011 | | | | FAIL |
Clint A Smith
|
|
|
ESC plan failed due not providing a plan narrative with the ESC plan map. Left a message with the applicant.
|