General Inspection | 10/11/2011 | 10/11/2011 | 10/11/2011 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 10/11/2011 | 10/11/2011 | 10/11/2011 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 9/9/2011 | 9/9/2011 | 9/9/2011 | | NR |
Clint A Smith
|
|
|
Sign is posted. But no work has not begun.
|
Permit Ready to Issue | | | 9/6/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/6/2011 | | DONE |
Tisha Gallop
|
|
|
received phone call from Vicki/M R Miller about permit status. Told her permit was in drawer, ready for pick up and told her fees due.
|
Issue & PRINT permit SFD | | | 9/6/2011 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 9/2/2011 | | |
|
|
|
|
Routing - Erosion and Sediment | 9/2/2011 | | 9/2/2011 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with the conditions attached to the permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/2/2011 | | |
|
|
|
|