General Inspection | 2/6/2012 | 2/6/2012 | 2/8/2012 | | PASS |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 2/8/2012 | 2/8/2012 | 2/8/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/22/2012 | 1/22/2012 | 1/23/2012 | | CANC |
Clint A Smith
|
|
|
weekend
|
General Inspection | 1/6/2012 | 1/6/2012 | 1/6/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/27/2011 | 10/27/2011 | 10/28/2011 | | PASS |
Jim Storey
|
|
|
|
General Inspection | 10/12/2011 | 10/12/2011 | 10/12/2011 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 9/27/2011 | 9/27/2011 | 9/27/2011 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/27/2011 | 9/27/2011 | 9/27/2011 | | CANC |
Clint A Smith
|
|
|
Moveed to a site preperation inspection
|
Routing - Erosion and Sediment | 9/20/2011 | | 9/21/2011 | | PASS |
Clint A Smith
|
|
|
ESc plan waiver approved with conditions attached to the permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2011 | | |
|
|
|
Tisha
|
Permit Ready to Issue | | | 9/21/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/21/2011 | | DONE |
Tisha Gallop
|
|
|
called Rod Wagner and left vm permit is ready and fees.
|
Issue & PRINT permit COM | | | 9/21/2011 | | DONE |
|
|
|
|
Application received | | | 9/20/2011 | | |
|
|
|
|