General Inspection | 6/12/2012 | 6/12/2012 | 6/12/2012 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 6/12/2012 | 6/12/2012 | 6/12/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/25/2012 | 5/25/2012 | 5/29/2012 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 5/10/2012 | 5/10/2012 | 5/11/2012 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 4/25/2012 | 4/25/2012 | 4/27/2012 | | PASS |
Tony Young
|
|
|
|
General Inspection | 4/10/2012 | 4/10/2012 | 4/10/2012 | | PASS |
Dixie Fellows
|
|
|
i pulled the project description and got the name of the rp which is parks/rec..they were unaware there was a building permit so i gave them tony's # to contact and get both permits finaled
|
General Inspection | 3/23/2012 | 3/23/2012 | 3/23/2012 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 3/8/2012 | 3/8/2012 | 3/12/2012 | | PASS |
Daryl DeGrange
|
|
|
|
General Inspection | 2/22/2012 | 2/22/2012 | 3/7/2012 | | PASS |
Tony Young
|
|
|
|
General Inspection | 2/7/2012 | 2/7/2012 | 2/7/2012 | | DONE |
Clint A Smith
|
|
|
Project has had temopary stabilization measures in place.
|
General Inspection | 1/22/2012 | 1/22/2012 | 1/24/2012 | | PASS |
Tony Young
|
|
|
|
General Inspection | 1/23/2012 | 1/23/2012 | 1/24/2012 | A | PASS |
Tony Young
|
|
|
|
General Inspection | 1/6/2012 | 1/6/2012 | 1/6/2012 | | PASS |
Daryl DeGrange
|
|
|
site clean, ground covered with hydro-seed
|
Site Preparation | 10/31/2011 | 10/31/2011 | 10/31/2011 | P | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 10/27/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 10/5/2011 | | 10/5/2011 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with conditions attahced to the permit.
|
Application received | | | 9/27/2011 | | |
|
|
|
|