General Inspection | 4/26/2012 | 4/26/2012 | 5/3/2012 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 5/3/2012 | 5/3/2012 | 5/3/2012 | P | PASS |
Dave Hannah
|
|
|
|
Site Final | 4/26/2012 | 4/27/2012 | 4/30/2012 | P | DONE |
Clint A Smith
|
|
|
All work completed. Permit finaled.
|
Site Final | 4/30/2012 | 4/30/2012 | 4/30/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/26/2012 | 3/26/2012 | 3/26/2012 | | PASS |
Daryl DeGrange
|
|
|
|
General Inspection | 2/23/2012 | 2/23/2012 | 2/24/2012 | | CANC |
Clint A Smith
|
|
|
|
General Inspection | 1/20/2012 | 1/23/2012 | 1/23/2012 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/20/2012 | 1/20/2012 | 1/20/2012 | | CANC |
Clint A Smith
|
|
|
MOved to 1/23/2012
|
Conference | 12/20/2011 | 12/20/2011 | 12/20/2011 | A | DONE |
Clint A Smith
|
|
|
Went over the conditions of the permit with the RP and explained the federal permit disclosure.
|
Issue & PRINT permit COM | | | 11/9/2011 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/1/2011 | | 11/1/2011 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with conditions attached to the permit.
|
Routing - Erosion and Sediment | 10/10/2011 | | 10/10/2011 | | FAIL |
Clint A Smith
|
|
|
ESC plan failed due to not providing a narrative with the plan map. Contacted the applicant and explained the requirements.
|
Application received | | | 10/3/2011 | | |
|
|
|
|