Site Final | 4/18/2012 | 4/18/2012 | 4/18/2012 | P | PASS |
Dave Hannah
|
|
|
|
Site Final | 4/13/2012 | 4/13/2012 | 4/13/2012 | A | FAIL |
Dave Hannah
|
|
|
needs to grade and landscape lot
|
Aging Inspection | 4/10/2012 | 4/10/2012 | 4/12/2012 | | PART |
Dave Hannah
|
|
|
needs to clean site and grade work in progress
|
General Inspection | 2/8/2012 | 2/8/2012 | 2/8/2012 | P | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 1/31/2012 | 2/2/2012 | 2/2/2012 | A | PART |
Clint A Smith
|
|
|
Message to RP: Remove all concrete washout residual on the lot. Washout was provided and lined with a poly liner.
|
BMP Violation | 1/31/2012 | 1/31/2012 | 1/31/2012 | A | FAIL |
Clint A Smith
|
|
|
Verbal Correction to RP: Clean up all concrete washout residual and provide a washout lined with a 10 mil poly liner. Will re-inspect on 2/2/2012
|
Aging Inspection | 1/26/2012 | 1/26/2012 | 1/30/2012 | | DONE |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 11/10/2011 | 11/10/2011 | 11/10/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
Site Preparation | 10/31/2011 | 10/31/2011 | 10/31/2011 | | PASS |
Dave Hannah
|
|
|
|
Issue & PRINT permit SFD | | | 10/28/2011 | | DONE |
|
|
|
|
Application received | | | 10/6/2011 | | |
|
|
|
|