Site Final | 8/30/2012 | 8/30/2012 | 8/30/2012 | P | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 8/30/2012 | 8/30/2012 | 8/30/2012 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 8/27/2012 | 8/27/2012 | 8/29/2012 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 7/10/2012 | 7/10/2012 | 7/10/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 5/28/2012 | 5/28/2012 | 5/28/2012 | | CANC |
Clint A Smith
|
|
|
Holiday
|
Random Inspection | 4/11/2012 | 4/11/2012 | 4/11/2012 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 3/22/2012 | 3/22/2012 | 3/30/2012 | | PASS |
Jim Storey
|
|
|
|
Site Preparation | 2/5/2012 | 2/5/2012 | 2/6/2012 | | NR |
Jim Storey
|
|
|
|
Issue & PRINT permit COM | | | 2/2/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 11/22/2011 | | 11/22/2011 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with conditions attached to the permit.
|
Telephone call | | | 11/22/2011 | | DONE |
|
|
|
Contacted the plan designer and informed him that the ESC plan / SWPPP does not meet the requirements per the federal Construction Genteral Permit. Recommended that he should review Part 5 of the 2008 C.G.P. to bring his plan to compliance with the federal requirement per the 2008 C.G.P.
|
Application received | | | 11/4/2011 | | |
|
|
|
|