General Inspection | 5/3/2013 | 5/3/2013 | 5/3/2013 | | DONE |
Clint A Smith
|
|
|
Permit finaled
|
DOC - Permit Finaled | 5/3/2013 | 5/3/2013 | 5/3/2013 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/18/2013 | 3/18/2013 | 3/18/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/29/2013 | 1/29/2013 | 1/29/2013 | | DONE |
Clint A Smith
|
|
|
Can not final permit
|
General Inspection | 12/14/2012 | 12/14/2012 | 12/14/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/29/2012 | 10/29/2012 | 10/29/2012 | | PASS |
Clint A Smith
|
|
|
Need to stabilized all exterior areas of the restuarant.
|
General Inspection | 9/11/2012 | 9/11/2012 | 9/11/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/24/2012 | 7/24/2012 | 7/25/2012 | | FAIL |
Clint A Smith
|
|
|
Message to RP: Maintain all storm drain inlet protection. Also provide information to the city of procedures on stabilization method of the stockpile along the NW end of project area.
|
General Inspection | 6/8/2012 | 6/8/2012 | 6/8/2012 | | PASS |
Jim Johnson
|
|
|
|
General Inspection | 4/23/2012 | 4/23/2012 | 4/23/2012 | | PASS |
Jim Johnson
|
|
|
|
Site Preparation | 3/8/2012 | 3/8/2012 | 3/8/2012 | P | PASS |
Jim Sly
|
|
|
William phone
|
General Inspection | 2/9/2012 | 2/9/2012 | 2/9/2012 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 12/25/2011 | 12/25/2011 | 12/27/2011 | | CANC |
Clint A Smith
|
|
|
Holiday
|
Permit Ready to Issue | | | 12/22/2011 | | DONE |
Barbara Stitt
|
|
|
|
Issue & PRINT permit COM | | | 12/22/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 12/7/2011 | | 12/7/2011 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with conditions attached to the permit.
|
Application received | | | 11/18/2011 | | |
|
|
|
|