Site Final | 10/31/2012 | 10/31/2012 | 11/1/2012 | P | PASS |
Dixie Fellows
|
|
|
chip gallagher
|
General Inspection | 10/29/2012 | 10/29/2012 | 10/31/2012 | | PEND |
Dixie Fellows
|
|
|
will drive by the job and check
|
General Inspection | 9/27/2012 | 9/27/2012 | 9/27/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/26/2012 | 7/26/2012 | 7/27/2012 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 6/25/2012 | 6/25/2012 | 6/25/2012 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/23/2012 | 5/24/2012 | 5/24/2012 | A | PASS |
Tony Young
|
|
|
|
Site Preparation | 5/16/2012 | 5/17/2012 | 5/17/2012 | A | PASS |
Tony Young
|
|
|
|
General Inspection | 4/27/2012 | 4/27/2012 | 5/9/2012 | | PASS |
Tony Young
|
|
|
|
Site Preparation | 4/27/2012 | 4/27/2012 | 4/27/2012 | P | PASS |
Tony Young
|
|
|
|
Random Inspection | 3/27/2012 | 3/27/2012 | 3/27/2012 | A | PASS |
Jim Storey
|
|
|
|
BMP Violation | 3/13/2012 | 3/14/2012 | 3/14/2012 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/13/2012 | 3/13/2012 | 3/13/2012 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up access at the asphalt infront of the gravel area of sediment off of the hard surface. Install a perimeter sediment barrier below the concrete washout area close to the street. Will follow up on 3/14/2012 pm.
|
General Inspection | 2/10/2012 | 2/10/2012 | 2/14/2012 | | PASS |
Daryl Spivey
|
|
|
|
Site Preparation | 1/10/2012 | 1/10/2012 | 1/10/2012 | A | PASS |
Clint A Smith
|
|
|
|
Routing - Erosion and Sediment | 1/9/2012 | | 1/9/2012 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with conditions attached to the permit. Plan is titled, "SWPPP". This is an Erosoin and Sediment Control Plan. Does not qualify as a SWPPP plan due to the size of the project and not being part of a commen plan of developement and sale.
|
Issue & PRINT permit SFD | | | 1/9/2012 | | DONE |
|
|
|
|
Application received | | | 12/5/2011 | | |
|
|
|
|
General Inspection | 8/27/2012 | 8/27/2012 | | | |
Dixie Fellows
|
|
|
|
Routing - Erosion and Sediment | 12/13/2011 | | | | FAIL |
|
|
|
ESC application failed due to not submitting an ESC plan Narrative supporting the ESC plan map. Left a message with the applicant and sent an e-mail of his requirements.
|