Site Final | 7/10/2012 | 7/10/2012 | 7/10/2012 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 7/10/2012 | 7/10/2012 | 7/10/2012 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 7/3/2012 | 7/3/2012 | 7/3/2012 | | PASS |
Dave Hannah
|
|
|
|
General Inspection | 6/1/2012 | 6/1/2012 | 6/1/2012 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 5/1/2012 | 5/1/2012 | 5/1/2012 | A | PASS |
Dave Hannah
|
|
|
|
BMP Violation | 4/4/2012 | 4/5/2012 | 4/5/2012 | A | PART |
Clint A Smith
|
|
|
Trash removed.
|
Random Inspection | 4/4/2012 | 4/4/2012 | 4/4/2012 | A | FAIL |
Clint A Smith
|
|
|
Message to RP: Provide a trash container and place all trash debris into the container once provided. Will re-inspect on 4/5/2012PM
|
Random Inspection | 3/7/2012 | 3/7/2012 | 3/7/2012 | P | PASS |
Tom Arcoraci
|
|
|
bmps in place
|
Site Preparation | 2/29/2012 | 2/29/2012 | 2/29/2012 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 2/20/2012 | 2/20/2012 | 2/21/2012 | | PART |
Clint A Smith
|
|
|
No activity has occurred yet. Only the equipment has been staged.
|
Issue & PRINT permit SFD | | | 2/17/2012 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/7/2012 | | 2/7/2012 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with conditions attached to the permit.
|
Application received | | | 1/30/2012 | | |
|
|
|
|