Site Final | 6/8/2012 | 6/8/2012 | 6/8/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 5/22/2012 | 5/22/2012 | 5/22/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 4/18/2012 | 4/18/2012 | 4/18/2012 | A | PASS |
Tom Arcoraci
|
|
|
|
BMP Violation | 4/3/2012 | 4/4/2012 | 4/6/2012 | P | PASS |
Tom Arcoraci
|
|
|
appears ok at this time talked to rp about ditchl protection
|
General Inspection | 4/3/2012 | 4/4/2012 | 4/3/2012 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Pile wood into one one central location not scattered throughout project. Place all trash debris into container that is provided. Protect the irragation canal at the front of lot. Will reinspect on 4/4/2012PM.
|
Site Preparation | 3/30/2012 | 3/30/2012 | 3/30/2012 | P | CANC |
Tom Arcoraci
|
|
|
|
General Inspection | 3/30/2012 | 3/30/2012 | 3/30/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 3/2/2012 | 3/2/2012 | 3/2/2012 | A | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 2/29/2012 | 2/29/2012 | 2/29/2012 | P | PART |
Tom Arcoraci
|
|
|
|
Site Preparation | 2/27/2012 | 2/27/2012 | 2/27/2012 | | PART |
Eric Strole
|
|
|
left verbal with rp to post esc sign, clean up all dirt and debris on hard surfaces and have a concrete washout before any concrete is poured. will reinspect when called for sewer inspection.
|
Issue & PRINT permit SFD | | | 2/24/2012 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 2/1/2012 | | |
|
|
|
|