Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC12-00131
StatusFinaled
Name OLIVER STEIGER
Site Address 12352 W FAIRVIEW AVE
Project NamePeterson Chevy of Boise
Customer Number 
ePlanReviewNo
Description
New Car Dealership and site improvments
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection5/13/20135/13/20135/13/2013 DONE
DetailsClint A Smith
Permit finaled.
DOC - Permit Finaled5/13/20135/13/20135/13/2013PPASS
DetailsClint A Smith
General Inspection4/11/20134/11/20134/15/2013 PASS
DetailsClint A Smith
General Inspection3/11/20133/11/20133/11/2013 PASS
DetailsClint A Smith
Tracking Control2/4/20132/7/20132/7/2013APASS
DetailsClint A Smith
General Inspection2/4/20132/4/20132/4/2013 FAIL
DetailsClint A Smith
Verbal to RP (oliver w/ Steed Cont.)
Provide a stabilized construction exit going out to Cloverdale. Will re-inspect on 2/7/2013
General Inspection1/3/20131/3/20131/4/2013 PASS
DetailsClint A Smith
General Inspection12/3/201212/3/201212/3/2012 PASS
DetailsKimberly M. Johnson
General Inspection11/2/201211/2/201211/2/2012 PASS
DetailsClint A Smith
BMP Violation9/28/201210/2/201210/2/2012APASS
DetailsClint A Smith
BMP Violation9/24/20129/27/20129/28/2012AFAIL
DetailsClint A Smith
WIll re-inspect on 10/2/2012
General Inspection9/21/20129/21/20129/24/2012 FAIL
DetailsClint A Smith
Verbal to RP(Tyson):
Maintain and replace washout area including the mortar mix area. Will re-inspect on 9/27/2012
General Inspection8/21/20128/21/20128/22/2012 PASS
DetailsClint A Smith
General Inspection7/19/20127/19/20127/19/2012 PASS
DetailsClint A Smith
BMP Violation6/14/20126/18/20126/19/2012APASS
DetailsClint A Smith
General Inspection6/13/20126/14/20126/14/2012AFAIL
DetailsClint A Smith
Verbal to RP:
Relocate ESC sign where visable from the street. Add access control measures to direct all traffic through the stabilized construction exit. Will follow up on 6/18/2012.
Site Preparation6/11/20126/12/20126/12/2012AFAIL
DetailsJim Sly
Odie phone ###-#### hfg-gfaj Talked to Odie (RP) about no SWIPP plans on site and no sign posted.
Site Preparation6/11/20126/12/20126/12/2012ACANC
DetailsJim Sly
Odie phone
Site Preparation6/11/20126/11/20126/11/2012PCANC
DetailsJim Sly
Odie phone............Re-sched........
Site Preparation5/9/20125/11/20125/11/2012PPART
DetailsClint A Smith
Verbal to RP andd GC:
Ammend the entrance and exit location so employees understand the entrance and the exit points on and off of the project area.
Issue & PRINT permit COM  5/8/2012 DONE
Routing - Erosion and Sediment3/5/2012 3/5/2012 PASS
DetailsClint A Smith
ESC12-00131 plan approved with conditions attached to the permit.
Application received  2/21/2012 DONE
Application submitted via PDS Online on Feb 21 2012 9:02AM