Site Final | 12/5/2012 | 12/5/2012 | 12/5/2012 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 12/5/2012 | 12/5/2012 | 12/5/2012 | P | PASS |
Jim Sly
|
|
|
|
Site Preparation | 12/5/2012 | 12/5/2012 | 12/5/2012 | A | CANC |
Jim Sly
|
|
|
Bryce phone
|
General Inspection | 11/12/2012 | 11/12/2012 | 11/13/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/11/2012 | 9/11/2012 | 9/12/2012 | | FAIL |
Clint A Smith
|
|
|
Message to RP to contact me over stock piles and the earth ramp.
|
BMP Violation | 7/10/2012 | 7/11/2012 | 7/11/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 7/10/2012 | 7/10/2012 | 7/10/2012 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP and project super; Clean up all hard surfaces of all sediment and debris. Replace the rock bags along the gutter pan of the ones that are broken apart. Provide storm drain inlet protection on all 4 of the storm drains at the entrance and exit of the school. Will follow up on 7/11/2012 PM.
|
Issue & PRINT permit COM | | | 5/3/2012 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 5/3/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 3/5/2012 | | 3/5/2012 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with condtions attached to the permit.
|
Application received | | | 2/27/2012 | | |
|
|
|
|
General Inspection | 5/8/2012 | 5/8/2012 | | | |
Jim Sly
|
|
|
|