General Inspection | 1/8/2013 | 1/8/2013 | 1/8/2013 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 1/8/2013 | 1/8/2013 | 1/8/2013 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 12/5/2012 | 12/5/2012 | 12/5/2012 | P | PASS |
Kimberly M. Johnson
|
|
|
slope has been stabilized with seed, blankets, and slope breaks. front yard landscaping complete. remaining exposed areas at top of slope and at bottom of slope will be hyroseeded/mulched
|
General Inspection | 11/7/2012 | 11/7/2012 | 11/8/2012 | | PART |
Clint A Smith
|
|
|
|
General Inspection | 10/5/2012 | 10/5/2012 | 10/5/2012 | | PART |
Kimberly M. Johnson
|
|
|
Engineered fill brought into gully and filled. Irrigation on hillside in progress. Final grading, seed and blankets scheduled for next week.
|
General Inspection | 9/4/2012 | 9/4/2012 | 9/4/2012 | P | PART |
Tony Young
|
|
|
work in progress
|
General Inspection | 8/28/2012 | 8/29/2012 | 8/29/2012 | A | PART |
Kimberly M. Johnson
|
|
|
Construction activities busted active sprinkler line. Resulted in formation of a gully and an off site discharge at the back (south side) of the property. Upon inspection, repair activities had already been initiated by Symon Co. Confirmed slope stabilization plan with RP
|
General Inspection | 8/20/2012 | 8/21/2012 | 8/22/2012 | A | PART |
Clint A Smith
|
|
|
Discussed with the RP and he will begin this next week in stabilizing the slope in the back portion of the project utilizing the wattles to break up the slope, track walk the slope and spray a hydrolic application on the slope for stabilization.
|
Random Inspection | 8/16/2012 | 8/16/2012 | 8/20/2012 | A | PART |
Clint A Smith
|
|
|
Left a message for the RP to discuss the slope in the back of the lot. Per the ESC plan the site is compliant. But due the the slope gade and the slope being denuded, the slope should have additional protection to break up the slope. Waiting for the RP to contact me.
|
General Inspection | 8/3/2012 | 8/3/2012 | 8/9/2012 | | PASS |
Tony Young
|
|
|
|
General Inspection | 7/2/2012 | 7/3/2012 | 7/3/2012 | A | PASS |
Tony Young
|
|
|
|
General Inspection | 6/29/2012 | 6/29/2012 | 6/29/2012 | | PASS |
Daryl Spivey
|
|
|
|
Site Preparation | 5/25/2012 | 5/25/2012 | 5/29/2012 | P | PASS |
Tony Young
|
|
|
ok now 5/29
|
BMP Violation | 5/27/2012 | 5/29/2012 | 5/29/2012 | A | PASS |
Tony Young
|
|
|
See prior inspection.// ok now
|
Site Preparation | 5/25/2012 | 5/25/2012 | 5/27/2012 | P | CANC |
Clint A Smith
|
|
|
Duplicate
|
BMP Violation | 5/25/2012 | 5/25/2012 | 5/27/2012 | P | FAIL |
Clint A Smith
|
|
|
Verbal correction to RP: (message) Must clean off all sediment off of the hard surfaces including all sidewalks. Install sediment abrriers back of sidewalk and provide additional erosion control coverage on the stockpiles along the back of sidewalk. NO CONCRETE IS QALLOWED TO BE PLACED UNTIL ALL VIOLATIONS ARE CORRRECTED. Will follow up on 5/29/2012AM.
|
General Inspection | 5/1/2012 | 5/1/2012 | 5/2/2012 | | CANC |
Clint A Smith
|
|
|
Canceled due to training session.
|
Issue & PRINT permit SFD | | | 4/25/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 3/7/2012 | | 3/7/2012 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with conditions attached to the permit.
|
Application received | | | 2/29/2012 | | |
|
|
|
|