General Inspection | 8/9/2012 | 8/9/2012 | 8/9/2012 | | DONE |
Clint A Smith
|
|
|
Permit finaled
|
DOC - Permit Finaled | 8/9/2012 | 8/9/2012 | 8/9/2012 | P | PASS |
Clint A Smith
|
|
|
|
Site Final | 7/9/2012 | 7/9/2012 | 7/9/2012 | P | PART |
Tom Arcoraci
|
|
|
incomplete reveg
|
BMP Violation | 6/29/2012 | 7/3/2012 | 7/5/2012 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/25/2012 | 6/25/2012 | 6/29/2012 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Install and reinstall perimeter controls along the back of sidewalk. Post ESC sign where visable from the street. Clean up all hard surfaces od any and all sediment and debris. Will follow up on 6/3/2012 PM.
|
Random Inspection | 5/25/2012 | 5/25/2012 | 5/25/2012 | A | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 5/14/2012 | 5/14/2012 | 5/14/2012 | A | PASS |
Jim Storey
|
|
|
|
Issue & PRINT permit SFD | | | 4/5/2012 | | |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 4/2/2012 | | 4/2/2012 | | PASS |
Clint A Smith
|
|
|
Full size ESC plan map submitted and approved.
|
Routing - Erosion and Sediment | 3/14/2012 | | 3/14/2012 | | PASS |
Clint A Smith
|
|
|
ESC plan approved with conditions attached to the permit.
|
Application received | | | 3/5/2012 | | |
|
|
|
|
General Inspection | 4/11/2012 | 4/11/2012 | | | |
Dixie Fellows
|
|
|
|