Aging Inspection | 3/31/2014 | 3/31/2014 | 3/31/2014 | | DONE |
Evan Jenkins
|
|
|
see final
|
DOC - Permit Finaled | 3/31/2014 | 3/31/2014 | 3/31/2014 | P | PASS |
Evan Jenkins
|
|
|
Vegetation Re-established via landscaping/sod complete No ESC Issues
|
Aging Inspection | 1/27/2014 | 1/27/2014 | 1/27/2014 | | PASS |
Jim Johnson
|
|
|
|
Aging Inspection | 11/25/2013 | 11/25/2013 | 11/25/2013 | | PASS |
Andy J. Long
|
|
|
Stabilization in progress. Exterior work and parking lot are finished. Some interior is still in progress. Should remove barrel of cleaning solution on pallet if finished.
|
Aging Inspection | 9/24/2013 | 9/24/2013 | 9/24/2013 | | PASS |
Andy J. Long
|
|
|
Construction is complete, vacant space on lot has begun to vegetate, but not is not fully stabilized. Can be revisited when the applicant tries to get permanent C of O
|
Site Final | 7/25/2013 | 7/25/2013 | 7/25/2013 | P | FAIL |
Kimberly M. Johnson
|
|
|
Needs to revegetate and remove empty drums from area southeast of building and parking lot.
|
General Inspection | 7/15/2013 | 7/15/2013 | 7/15/2013 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/14/2013 | 5/14/2013 | 5/14/2013 | | PART |
Clint A Smith
|
|
|
Working on stabilization.
|
Random Inspection | 3/14/2013 | 3/14/2013 | 3/14/2013 | P | PASS |
Kimberly M. Johnson
|
|
|
Status of topsoil stockpile and concrete rubble? Per Mike at Spiers contruction, the topsoil stockpile is being actively worked and will be used to fill the planters for landscaping. The rest will be hauled off.
|
Aging Inspection | 2/11/2013 | 2/11/2013 | 2/11/2013 | | CANC |
Alan Hauser
|
|
|
|
BMP Violation | 12/12/2012 | 12/14/2012 | 12/14/2012 | A | PART |
Clint A Smith
|
|
|
Still need to clean up hard surfaces of all sediment and debris.
|
General Inspection | 12/7/2012 | 12/11/2012 | 12/11/2012 | A | FAIL |
Clint A Smith
|
|
|
Clean up all hard surfaces of all sediement and slurry. Protect all parking lot storm drains. Will follow up on 12/14/2012
|
Random Inspection | 10/23/2012 | 10/23/2012 | 10/23/2012 | P | PART |
Jim Sly
|
|
|
Darren phone Verbal to Mike and (RP) Darren .....Need to re-build track out drain rock area. Area overrun by mud and tracking out onto Eagle Rd.
|
General Inspection | 10/8/2012 | 10/8/2012 | 10/9/2012 | | CANC |
Alan Hauser
|
|
|
|
General Inspection | 8/8/2012 | 8/8/2012 | 8/9/2012 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 6/8/2012 | 6/8/2012 | 6/8/2012 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 6/5/2012 | | DONE |
Tisha Gallop
|
|
|
|
Issue & PRINT permit COM | | | 4/12/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 4/10/2012 | | DONE |
Tisha Gallop
|
|
|
Per Clint issue esc permit with Rough Grading permit Bld12-00756.
|
Routing - Erosion and Sediment | 3/30/2012 | | 3/30/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00240 plan approved with conditions attached to the permit.
The fee has changed from $78.75 to $131.25. There is a differance of $52.50 that must be paid for due to area of disturbance was not accurate that was included on the application.
|
Application received | | | 3/19/2012 | | |
|
|
|
|
General Inspection | 4/19/2012 | 4/19/2012 | | | |
Jim Sly
|
|
|
|